ADS-B In authorizations: in-trail procedure (A354) and CDTI assisted visual separation (A355)
ADS-B In authorizations: in-trail procedure (A354) and CDTI assisted visual separation (A355)
Available · prepared by a specialist
About this document
What it is
Authorizations for the ADS-B In in-trail procedure (A354) and CDTI assisted visual separation (A355).
Who needs it
Part 91, 91K, 125 and 135 operators with ADS-B In equipment who want to use these procedures.
What you get
- Request letter and in-trail procedure proposal
- ADS-B In eligibility and maintenance
- MEL, manuals and flight planning
- Training
What's included
- Document in DOCX and PDF, prepared by a specialist from your answers and records
- Verification report: each applicable requirement in FAA Order 8900.1 Vol 3 Ch 18 Sec 3 (A354, A355), the paragraph it comes from, and the result
- Review and sign-off by a named, qualified specialist before release
- Form / paragraph: LOA, OpSpec or MSpec A354 and A355
- You provide: ADS-B In installation approval and test records, equipment list, MEL revision, flight manual supplement and pilot training
- FAA action: Approved with FAA headquarters concurrence
- How it's submitted: You send it to your Flight Standards office or principal inspector; we give you step-by-step instructions
For airplanes and helicopters. Operators: 91;91K;125;135.
See the format of our documents, shown as specimens for a fictitious operator.
Read the ADS-B In authorizations: in-trail procedure (A354) and CDTI assisted visual separation (A355) guide When you need it, what the FSDO checks and common reasons submissions are returned.
How it works
Answers and records
A short intake about your aircraft and operation, then the records we list for you. Tell us who holds them (your maintenance provider, DO or management company) and we request them directly, with a secure upload link, and follow up for you.
A specialist prepares everything
A named specialist prepares the complete package from your records, checks it against the published requirements, and sends you a proof. Questions go to one person who knows your file.
Flat fee, in two parts
One fixed price, shown before you pay anything. A 50% deposit starts the work; the balance is due only when you approve the finished documents.
Flat fee $400. You see your order total before you pay anything.
You confirm your order at its flat fee, then a 50% deposit starts the work. The remaining 50% is due only when you approve the finished documents. The deposit is refundable before work starts.
Request this document Talk to a specialist
Not legal advice. Not FAA approval or acceptance. You are responsible for final review, signature and submission to the FAA.
RotorDocs is not affiliated with or endorsed by the FAA. Not legal advice. We cannot guarantee FAA acceptance or approval. You are responsible for the accuracy of your answers and for submitting to the FAA. Liability is limited as set out in the Terms.